Daijiworld Media Network - Mumbai
Mumbai, Nov 19: Flight operations at Mumbai's Chhatrapati Shivaji Maharaj International Airport (CSMIA) will remain suspended for six hours on Thursday, November 19, as both runways will be temporarily closed for annual post-monsoon maintenance work.
The two runways, RWY 09/27 and RWY 14/32, will remain closed from 11 am to 5 pm, during which all takeoffs and landings will be suspended.

The annual maintenance programme involves inspection and repair of runway surfaces, lighting systems, markings and other essential technical infrastructure. The airport authorities have coordinated with airlines and relevant departments to minimise inconvenience to passengers.
Domestic and international flights scheduled to arrive at or depart from Mumbai during the six-hour period may be affected. However, the suspension does not mean that all flights operating on November 19 will be cancelled, as operations are expected to resume after the maintenance work is completed and the necessary clearance is received.
Passengers have been advised to check their flight schedules and status with their respective airlines before leaving for the airport.
Meanwhile, Mumbai Airport has allocated slots to only 38 of the 50 foreign airlines that had sought them for the Summer Schedule 2027.
The development comes amid opposition from international airlines to the airport operator's proposal to shift international flight operations to Navi Mumbai Airport in view of the planned renovation of Terminal 1 at Mumbai Airport from early next year.
Mumbai and Navi Mumbai airports are part of Adani Airport Holdings Ltd (AAHL), while Mumbai Airport is operated by Mumbai International Airport Ltd (MIAL).